top of page

Phase 10B Tailings Dam

All earthworks, liner, and piping for a large tailings dam raise. Project included a pipe conveyance channel and piping upgrades for the tailings delivery system.

Project Gallery

Untitled design (3).png

Contact Info

3755 Manzanita Lane
Elko, NV 89801

Phone: 775-753-0986

Fax: 775-777-7442

Open M-F, 8 AM to 4 PM

© 2025 High Mark Construction LLC

Designed By:

Socially Rx Logo
bottom of page